1. ABOUT THE PROJECT

  • Yazıcı Demir Çelik Sanayi ve Turizm Ticaret A.Ş. is planning to develop a Solar Power Plant (SPP) within the boundaries of Sinanlı Neighborhood (Şehitler Mevkii), Polatlı District, Ankara Province.
  • The project will have an installed capacity of approximately 60 MWm / 47 MWe and will generate renewable electricity. The project scope includes the installation of solar panels, inverters, transformers, internal access roads, auxiliary electrical infrastructure, and an energy transmission line.
  • The engineering, procurement, and construction (EPC) activities for the project will be carried out by YEO Teknoloji Enerji ve Endüstri A.Ş.
  • The project aims to generate renewable energy, contribute to reducing greenhouse gas emissions associated with fossil fuels, and support Türkiye’s transition to clean energy.
  • The project site is located in Sinanlı Neighborhood (Şehitler Mevkii), Polatlı District, Ankara Province.
  • The project area consists of the following parcels:
  • Block 102, Parcel 220
  • Block 102, Parcel 221
  • Block 102, Parcel 222
  • Block 102, Parcel 223
  • Block 102, Parcel 224

2. ENVIRONMENTAL AND SOCIAL IMPACTS

During the construction phase, the following impacts may occur:

  • Dust generation,
  • Noise generation,
  • Increased traffic due to construction vehicles,
  • Temporary waste generation,
  • Movement of construction machinery,
  • Temporary land-use impacts.

These impacts will be temporary and managed in accordance with the Environmental and Social Management Plans prepared for the project.

  • Biodiversity assessments have been conducted as part of the project.
  • Should any historical artifact, archaeological find, or cultural heritage asset be encountered during construction activities, all work will be suspended immediately, and the relevant authorities will be notified.
  • Communication with local communities, village headmen (muhtars), public authorities, and other stakeholders will be maintained throughout the project.
  • Feedback, suggestions, and grievances submitted by stakeholders will be documented, reviewed, and addressed. 

3. GRIEVANCE MECHANISM

To meet our Environmental, Social, and Quality Standards, we provide a grievance mechanism through which concerns, complaints, requests, and suggestions related to our activities and projects can be submitted and evaluated. With your feedback, we continuously improve our management systems and performance.

All feedback is taken seriously and reviewed with due diligence. Every submission received by the Environment, Sustainability & Quality Department is subject to a formal review process, and you will be kept informed throughout each stage of the process.

Our response time for submitted requests is 15 days.

You may submit your feedback by sending an email to yaziciankarages@dilerhld.com.

OTHER MEDIA CENTER

news

28.05.2025

Diler Group Ranked in the ISO 500 List with Three Companies

The Diler Group, with three of its companies featured in the Istanbul Chamber of Industry's (İSO) ""Turkey's Top 500 Industrial Enterprises - 2024"" list, has demonstrated its sustainable growth vision through its diverse operations spanning manufacturing to energy. Diler Iron & Steel, Yazıcı Iron & Steel, and Atlas Energy, all of which secured spots on the prestigious list, stood out for their outstanding performance in their respective sectors.

See Details

arrow-right
news

01.06.2025

Diler Celebrated OHS Week Together with 800 Employees

Diler Holding upholds occupational health and safety (OHS) as one of its core corporate priorities. In line with this commitment, the company successfully concluded its traditional OHS Week this year, held throughout May with a series of engaging activities. Spanning four days, the program featured knowledge competitions, virtual reality applications, and interactive booths, providing nearly 800 employees with an immersive and participatory experience to reinforce a culture of safety. The initiatives were designed to elevate awareness and strengthen workplace safety practices across the organization.

See Details

arrow-right
news

07.01.2025

A Strong Contribution from Diler to Türkiye’s Energy

Diler Holding continues to add value to Türkiye’s electricity generation through its sustainability-focused energy investments. As of 2024, the Holding achieved total electricity generation exceeding 8.4 million MWh through Atlas Thermal Power Plant, Dim Hydroelectric Power Plant, and Çelebiler Solar Power Plant, establishing a strong energy capacity capable of reaching millions of households across the country.

See Details

arrow-right
logo